Anambra State House of Assembly’s Committee on Works and Infrastructure has inspected the ongoing road construction projects on Nwokedi and Edmund streets, including extensions 1, 2, 3, and 4 in Okpoko, Ogbaru Local Government Area.
Awarded by the state government, the visit aimed to assess the progress of work and ensure the contractors are adhering to the project’s specifications.
The committee, led by its chairman and member representing Orumba South Constituency, Honourable Emma Nwafor, expressed satisfaction with the quality of materials being used, particularly in the construction of the drainage system, which he said is critical for managing floodwaters in the area.
From findings, the committee also highlighted several challenges the contractors are facing, including adverse effects of heavy rainfall and domestic wastewater from surrounding buildings.
The contractor handling the job, Engineer Austin Ezeadi said that the three point five kilometer road will be completed in less than five months, assuring not to compromise standards.
Comments are closed for this post.